Hello everyone,
Anyone know how I can change the placeholder format of the Date field in OIM version 9.1?
The placeholder has the format M/d/yyyy and I would like to use DD/MM/YYYY which corresponds to the French format.
Thanks in advance
Hello everyone,
Anyone know how I can change the placeholder format of the Date field in OIM version 9.1?
The placeholder has the format M/d/yyyy and I would like to use DD/MM/YYYY which corresponds to the French format.
Thanks in advance
Hi,
I need to change the ExitDate value into the Designer, how can I set it to a specific value? For exemple, when a user is created on the web portal I want to set the ExitDate as default at 2999-1-1.
Thank you,
Elena
Hello everyone,
Since the 8.1, date are now writable for an entitlement request by the user directly while before it was mandatory to use the calendar.
We have done the migration from 8.0.1 to 8.1.4 and the customer wants the previous behavior.
He request…
Hi All,
I have created some email templates in Designer tool under Mail Templates section. one thing that is bothering me is how to get the DATE populated dynamically in the email templates so that the user will be seeing the date in the email when it receives…
Hello 1IM community,
In previous versions of Identity Manager (v6) we used a method called "VI.AE.Customizer.Holiday.GetNextWorkDay" to calculate a working date based on 1IM standard working hours / days feature (e.g. to set a new ValidUntil on a PersonWantsOrg…
Greetings, Background: I am attempting to export a report in Report Editor that contains a datatime field and would like to export the field in excel as a date format. When the report is exported into Excel, my fields displays a string and not as a date…
Dear Community,
I have found a strange behavior in date select controls in the standard web portal.
We have build a custom form where we need to fill the persons Entry and ExitDate with only the date, not the time.
We managed show only the date select…
Greetings,
I am not able to locate the correct syntax when using a data parameter where the Range = Yes for the Report Editor. I created a date parameter for my report and set it to Range = Yes but I am receiving errors when executing it because the syntax…
One of the nuisances I've had with V7 is that you now set the Culture instead of the Language in rich client settings.
The consequence is that for example all dates are formatted according to the culture as well. So when I select English (which is…