• How to schedule a job to run hourly except a particular interval

    How to schedule a job to run hourly except a particular interval ?

    I tried it in Designer > Edit Schedule, but there is no such option to put exception interval.

    Checked both in OIM Version 8.1.5 and 9.1.1

  • Scheduled task not running

    Hi,

    A scheduled report has stopped running. It is scheduled to run on the 1st day of the month to email report of all new users. It last ran successfully on Dec 1 2016. It is enabled and set to run on a monthly basis with 1 as the frequency at 9 UTC.