Sync virtual attribute values in side by side setup (6.9 -> 7.4)

Hi,

we are running ARS 6.9 in our production environment and are heavily using virtual attributes. I've set up ARS 7.4 side by side a while ago to familiarize with the new version, imported the 6.9 configuration and MH and already configured some workflows, policies and websites in 7.4. Is there a way to sync the virtual attribute (value) changes that occurred in the meantime in 6.9 to 7.4 without re-importing the whole configuration?

Thanks,
Jochen

Parents
  • Yes - you could setup a synchronization job / workflow step using the Active Roles Sync Service.

    Just establish a "Connection" using the Active Roles Connector type to each side (6.9  and 7.4) and then create an "Update" workflow step containing mapping rules for all of your VAs to push the values from your 6.9 instance to your 7.4 instance.

Reply
  • Yes - you could setup a synchronization job / workflow step using the Active Roles Sync Service.

    Just establish a "Connection" using the Active Roles Connector type to each side (6.9  and 7.4) and then create an "Update" workflow step containing mapping rules for all of your VAs to push the values from your 6.9 instance to your 7.4 instance.

Children