PowerBI on SPP

Hello

I am trying to use PowerBI with SPP however I am getting an error during the loading of data. (Screenshot attached). I had any error with PowerBI for SPS, it's working very well, but during the configuration I had to import the SPS Certificate to the machine where PowerBI is installed. Anyone knows if has an extra configuration about SPP?

Thank you